Prefab house roof

( Còn hàng )
Liên hệ
Step 2: Installation of a lightweight material, depending on the ground erect wall panels can be mounted on the front frame and mounting plate or wall framing.
Step 3: Finishing, including instal
Đặt mua qua điện thoại (8h - 12h) 0982601111
Miễn phí lắp đặt và vận chuyển Bảo hành: Đang cập nhật

PROCESS AND INSTALLATION WORKS BY THE ROOF:
1. Installation on a concrete base:
Step 1: Create a flat concrete floor, concrete use 150 or higher grade. Surrounded corresponding size to the size of light weight materials, thicknesses from 80mm to 100mm. As for the two-storey concrete floors more 200x300mm beams around the perimeter.
Step 2: Installation of a lightweight material, depending on the ground erect wall panels can be mounted on the front frame and mounting plate or wall framing.
Step 3: Finishing, including installation of electrical systems, water, ventilation ...

2. Insert the ground or sand:
Step 1: Locate the anchor drill and drill ground. Then linkage beams and floor slabs to reach the light materials.
Step 2: Installation of a lightweight material, depending on the ground erect wall panels can be mounted on the front frame and mounting plate or wall framing.
Step 3: Finishing, including installation of electrical systems, water, ventilation ...