Light House is based on the optimal goal of using materials while ensuring rigidity requirements for safety and insulation capacity
Đặt mua qua điện thoại (8h - 12h) 0982601111
Miễn phí lắp đặt và vận chuyển Bảo hành: Đang cập nhật

House lightweight materials, also known as the Panel can be used for many different purposes:
- The company's office, executive office at the school.
- Housing dormitory for workers.
- Houses floating on a lake or wetland areas, areas with very weak ground.
- Schools for the pupils and remote.

Light House is based on the optimal goal of using materials while ensuring rigidity requirements for safety and insulation capacity. Besides high assembling properties makes erection becomes extremely quick and accurate. After a period of use of the product can be removed and used installed at the new location. (See detailed images)

Constitute:

Frame houses: Use galvanized steel shaped folding, steel box, surface coating paint 2 Pu withstand the harsh outdoor environment.

Wall plates: Use 50mm thick EPS panels with sound insulation and high thermal insulation.

Foundations: Can use concrete foundation or steel base frame mounted on the ground floor, sand and anchored down by the coiled anchor drill.

Installation process:

Installation on a concrete base:

Step 1: Create a flat concrete floor, concrete use 150 or higher grade. Surrounded corresponding size to the size of light weight materials, thicknesses from 80mm to 100mm. As for the two additional floors concrete floor surrounded 200x300mm beams.

Step 2: Installation of a lightweight material, depending on the ground erect wall panels can be mounted on the front frame and mounting plate or wall framing.

Step 3: Finishing, including installation of electrical systems, water, ventilation ...

Installation on the ground or sand:

Step 1: Locate the anchor drill and drill ground. Then linkage beams and floor slabs to reach the light materials.

Step 2: Installation of a lightweight material, depending on the ground erect wall panels can be mounted on the front frame and mounting plate or wall framing.

Step 3: Finishing, including installation of electrical systems, water, ventilation ...